Enter Production

Tags:
fa2Add my vote for this tag create new tag

Table of Contents

Transaction Description

Use the Periodic Production window to manually enter production unit amounts and dates for assets depreciating under the units of production method. note This type of production method is used only in the corporate book(s).

There are several restrictions on which dates can be used. The start date and end date must fall within a single depreciation period in the assets calendar. When there are multiple entries for the same asset, date ranges cannot overlap. Finally, the date must be after the asset's date placed in service, and the dates cannot be for periods prior to the current open period in the corporate book. Entries can be made for future periods and updated when the future becomes the current period.

Production for construction in progress assets cannot be entered until they are capitalized.

note For significant quantities of entries, consider using the production interface.

Find Production Amounts

Screen Shot List of Fields

  • Book
  • Periods
  • Asset Number
  • Description
  • UOM




Periodic Production

Screen Shot List of Fields

  • Asset Number
  • Description
  • From Date
  • To Date
  • UOM
  • Production
  • Descriptive Flexfield






Comments

 

Links

This Topic Is Referenced By These Topics:
Related Links: FA12ProductionUpload



Was This Topic Useful to You?

Others rated this topic as shown. Please include your rating.
Choice
leftbarmainbarrightbar Somewhat Useful (1)

Collaborating Authors and Reviewers: -- DianeMcHugh, JimCrum

Topic revision: r4 - 22 Jan 2009 - 22:43:10 - JimCrum
 
This site is powered by the TWiki collaboration platformCopyright © 2012 by the contributing authors. All material on this collaboration platform is the property of the contributing authors. Permission to copy, distribute and/or modify is granted for this document under the GNU Free Documentation License.
Ideas, requests, problems regarding WikiOraApps? Send feedback